您当前的位置:
首页 >
文章列表页 >
Improved wavelet thresholding combined with optimized BiLSTM for dam deformation prediction
更新时间:2026-06-30
    • Improved wavelet thresholding combined with optimized BiLSTM for dam deformation prediction

    • Journal of Hydroelectric Engineering   Vol. 43, Issue 7, (2024)
    • DOI:10.11660/slfdxb.20240709    

      CLC:
    • Online First:25 July 2024,

      Published:2024

    移动端阅览

  • 石佳晨, 岳春芳, 朱明远, et al. Improved wavelet thresholding combined with optimized BiLSTM for dam deformation prediction[J]. Journal of Hydroelectric Engineering, 2024, 43(7). DOI: 10.11660/slfdxb.20240709.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

MPM-DEM hierarchical multiscale method for macroscopic and microscopic analysis of deformation in rockfill dams
Prediction of aqueduct deformation based on time series decomposition and machine learning
Long-term deformation prediction model of concrete dams and its application
Intelligent deformation predicting methods for underground chambers of Longtan hydropower station
Deformation prediction of high embankment dams by combining time series decomposition and deep learning

Related Author

马刚
王頔
李易奥
周伟
安妮
马钰明
王仁超
赵鹏远

Related Institution

State Key Laboratory of Hydrology-Water Resources and Hydraulic Engineering, Hohai University
College of Water Conservancy and Hydropower Engineering, Hohai University
Research Institute of Geotechnical Engineering,Hohai University
Key Laboratory of Ministry of Education for Geomechanics and Embankment Engineering, Hohai University
State Key Laboratory for Geomechanics and Deep Underground Engineering,China University of Mining and Technology
0