您当前的位置:
首页 >
文章列表页 >
Integrating fast frequency response ancillary services: a global review of technical, procurement, and market integration challenges
更新时间:2026-02-06
    • Integrating fast frequency response ancillary services: a global review of technical, procurement, and market integration challenges

    • Clean Energy   Issue 2, (2025)
    • DOI:10.1093/ce/zkae105    

      CLC:
    • Published:2025

    移动端阅览

  • Gergo Varhegyi, Mutasim Nour, Integrating fast frequency response ancillary services: a global review of technical, procurement, and market integration challenges, Clean Energy, Volume 9, Issue 2, April 2025, Pages 204–218, https://doi.org/10.1093/ce/zkae105 DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Solar-powered hydrogen: exploring production, storage, and energy integration strategies
Assessment of the impact of a 10-MW grid-tied solar system on the Libyan grid in terms of the power-protection system stability
Assessment of high-gain quadratic boost converter with hybrid-based maximum power point tracking technique for solar photovoltaic systems
Nuclear symmetry energy from QCD sum rules
Density and temperature of fermions and bosons from quantum fluctuations

Related Author

Ge Chen
Renhui Sun
Baodong Wang
Feras Alasali
Abdelaziz Salah Saidi
Naser El-Naily
Othman Alsmadi
Mohamed Khaleel

Related Institution

CHN Energy Europe Research GmbH
National Institute of Clean-and-Low-Carbon Energy
Department of Electrical Engineering, Faculty of Engineering, The Hashemite University
Department of Electrical Engineering, King Khalid University
Université de Tunis El Manar, École Nationale d’Ingénieurs de Tunis, Laboratoire des Systèmes Électriques
0