您当前的位置:
首页 >
文章列表页 >
Primary frequency control considering communication delay for grid-connected offshore wind power systems
Artificial Intelligence Applied in Renewable Energies | 更新时间:2026-07-14
    • Primary frequency control considering communication delay for grid-connected offshore wind power systems

    • Global Energy Interconnection   Vol. 7, Issue 3, Pages: 241-253(2024)
    • DOI:10.1016/j.gloei.2024.06.008    

      CLC:
    • Online First:29 June 2024,

      Published:29 June 2024

    移动端阅览

  • Xueping Pan, Qijie Xu, Tao Xu, et al. Primary frequency control considering communication delay for grid-connected offshore wind power systems[J]. Global Energy Interconnection, 2024, 7(3): 241-253. DOI: 10.1016/j.gloei.2024.06.008.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

An ethical assessment framework for AI security and ethics in smart grid
A context-driven dynamic modeling method for ultra-short-term wind power forecasting
AI-driven forecasting of the world energy index: The role of Iraq’s GDP in global energy interconnection
Electrical power generation in Antarctica: challenges, opportunities and future work for Turkish Antarctic Research Station
Advancing electric vehicle ecosystems: a survey of generative artificial intelligence and distributed machine learning applications

Related Author

No data

Related Institution

No data
0