Analysis of Cracking on High and Medium Pressure Rotor of 300 MW Team Turbine
更新时间:2025-04-27
    • Analysis of Cracking on High and Medium Pressure Rotor of 300 MW Team Turbine

    • Vol. 40, Issue 4, Pages: 54-59(2021)
    • CLC: TM62
    • Published:2021

    移动端阅览

  • LI Haisheng. Analysis of Cracking on High and Medium Pressure Rotor of 300 MW Team Turbine[J]. 2021, 40(4): 54-59. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

7

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis and Treatment on Casting Three-way Crack of High Temperature Header in 600MW Thermal Power Unit
Energy Saving Reform of Clean and Hydrophobic System in 660 MW Subcritical Plant
Analysis and Treatment of Bearing Vibration Failure of 350 MW Supercritical Steam Turbine Unit
基于改进SSD的输电场景绝缘子识别
基于Nelder-Mead算法的四轴无人机分数阶PID控制器参数设计方法

Related Author

CHEN Shunqing
YU Changjiang
MAO Zhizhong
TANG Haifeng
GUO Ruitao
SUN Guangjian
LI Zhigang
AN Rushan

Related Institution

Hebei Guohua Cangdong Power Generation Co.,Ltd.
Huaneng Hanfeng Power Plant
Huaneng Shang′an Power Plant
Inner Mongolia Jingneng Kangbashi Thermal Power Co., Ltd.
0