Analysis of Primary Frequency Regulation Technology and Parameter Configuration of New Energy Stations
|更新时间:2025-04-27
|
Analysis of Primary Frequency Regulation Technology and Parameter Configuration of New Energy Stations
Vol. 40, Issue 5, Pages: 36-38+43(2021)
作者机构:
1. 国网河北省电力有限公司电力科学研究院
2. 河北华瑞能源集团有限公司
3. 中国电建集团河北省电力勘测设计研究院有限公司
作者简介:
基金信息:
DOI:
CLC:TM73
Published:2021
稿件说明:
移动端阅览
WANG Lei, YU Tengkai, CHEN Shuoxin, et al. Analysis of Primary Frequency Regulation Technology and Parameter Configuration of New Energy Stations[J]. 2021, 40(5): 36-38+43.
DOI:
WANG Lei, YU Tengkai, CHEN Shuoxin, et al. Analysis of Primary Frequency Regulation Technology and Parameter Configuration of New Energy Stations[J]. 2021, 40(5): 36-38+43.DOI:
Analysis of Primary Frequency Regulation Technology and Parameter Configuration of New Energy Stations
The installed capacity of new energy in Hebei South Power Grid is increasing
which leads to the weakening of primary frequency regulation ability of power grid.Therefore
new energy is required to have the ability to participate in primary frequency regulation of power grid.This paper analyzes three ways and their advantages and disadvantages of primary frequency regulation transformation of new energy station.For the new energy station of Hebei South power grid
the analysis and calculation of primary frequency modulation response dead zone
response amplitude limiting
frequency ending point
modulation difference rate and other parameters are carried out
which can provide technical support for the primary frequency regulation transformation and field test of new energy station.According to the parameters of this paper
the primary frequency regulation response device is configured.Through field measurement the accuracy and effectiveness of the device under frequency step disturbance are verified.