您当前的位置:
首页 >
文章列表页 >
Summary of Application of Heat Pipe Air Preheater to Pulverized Coal Fired Boiler of Power Plants
更新时间:2025-11-18
    • Summary of Application of Heat Pipe Air Preheater to Pulverized Coal Fired Boiler of Power Plants

    • Issue 4, Pages: 19-21(1991)
    • Published:1991

    移动端阅览

  • Chen Dayuan Ni Debin. Summary of Application of Heat Pipe Air Preheater to Pulverized Coal Fired Boiler of Power Plants[J]. 1991, (4): 19-21. DOI:

  •  
  •  

0

Views

18

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Technical Analysis on Finned tube and Heat Pipe Used for Large CFB
Transformation of Tail-heating Surface of Power Station Boiler
Causes and Countermeasures of Ash Accumulation on Ljungstrom Air Preheatsr’s Heating Elements

Related Author

Fu Xingyou Yang Qihui Deng Ruiqi Liu Xingren LiBing Yuan Yi
杨奇辉
邓瑞琪
刘兴仁
李兵
袁毅
Yang Qihui Liu xingren Li Bin
刘兴仁

Related Institution

Dujiang Elecbric Power Equipment works
Dujiang Electric Power Equipment Work
Jiangyou Power Plant
0