您当前的位置:
首页 >
文章列表页 >
Project Design and Operation of Jinsu Power Plant
更新时间:2025-11-18
    • Project Design and Operation of Jinsu Power Plant

    • Issue 5, Pages: 4-8(1991)
    • Published:1991

    移动端阅览

  • Fang Liming. Project Design and Operation of Jinsu Power Plant[J]. 1991, (5): 4-8. DOI:

  •  
  •  

0

Views

4

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Compilation and Application of Design Calculating Program to Venturi Water Film Dust Precipitator
Common Use Topology Design Of Microcomputer Local Area Networks
52kV气体绝缘开关柜的安全可靠性
Important Problems in Preliminary Selecting Mode of Hydroelectric Set for Hydroelectric Power Station
To Built Added Sub dam by Ash in Tongguanxi Ash Pond in Douba Power Plant

Related Author

陈建春
Fan Liming Chen Jianchun
Liu Yi
爱里奇·松勒斯基因
哈罗德·芬克
Ou Xuexiu
张自端
Fan Yunfei

Related Institution

Sichuan Electric Power Investigation and Design Institute
  四川电力工业局勘察设计院 610016  
Chongqing Power Plant
Sichuan Test and Research Institute of Electrical Power ) Keywords hydroelectric set efficiency type selection design hydraulic head annual electric energy generating capacity
South West Electric Design Institute ) Zhang Ziduon
0