Rate Duration of Switching off 220~750kV Operating Transmission Lines While Setting up Transmission Lines and Overhead Ground Wires in Construction of 500~1500kV Cross Lines
更新时间:2025-11-18
    • Rate Duration of Switching off 220~750kV Operating Transmission Lines While Setting up Transmission Lines and Overhead Ground Wires in Construction of 500~1500kV Cross Lines

    • Issue 2, Pages: 53-54(1992)
    • Published:1992

    移动端阅览

  • B. P. Piskunov. Rate Duration of Switching off 220~750kV Operating Transmission Lines While Setting up Transmission Lines and Overhead Ground Wires in Construction of 500~1500kV Cross Lines[J]. 1992, (2): 53-54. DOI:

  •  
  •  