您当前的位置:
首页 >
文章列表页 >
Inviting Tenders for Large Size Hydroelectric Station and Making Technical Specifications of Its Unit
更新时间:2025-11-18
    • Inviting Tenders for Large Size Hydroelectric Station and Making Technical Specifications of Its Unit

    • Issue 2, Pages: 1-5(1992)
    • Published:1992

    移动端阅览

  • Ou Xuexiu. Inviting Tenders for Large Size Hydroelectric Station and Making Technical Specifications of Its Unit[J]. 1992, (2): 1-5. DOI:

  •  
  •  

0

Views

10

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Development of Water Turbine Runner for Improvement of Shizitan Hydroelectric Station
Improvement of Heat Insulations on Unit 3 of Douba Power Plant
Application and Monitoring of Abrasion Resistance Hydraulic Oil in Hydroelectric Power Plant
Application of Distributed Intelligent I/O Network in 200MW Set
渔子溪电站水轮机组技术改造

Related Author

Huang Yisheng
Liu Minyi
金娜
Song Yapeng
陈晓玲
李晓雪
杨桦
柴继文

Related Institution

Xian Thermal Power Engineering Research Institute,Ministry of Energy
Huaneng Taipingyi Hydroelectric Power Plant,)Na
映秀湾发电总厂
四川华能太平驿水电厂映秀湾发电总厂
Sichuan Test & Research Institute of Electrical Power ) Keywords computer monitoring system 200MW generating set
0