国网吉林省电力有限公司大安市供电公司
Published:2024
移动端阅览
[J]. 2024, (8): 31-32.
DOI:
[J]. 2024, (8): 31-32. DOI:
电网项目的规划与建设对环境的影响是多方面的,本文以吉林白城吉西基地“大安700兆瓦风电+光伏+光热220千伏送出工程”为案例,分析了该项目的环境影响评估与管理,旨在强调环境影响评估在电网建设中的重要性。电网项目的规划与建设对环境的影响是多方面的,涉及土地、生态、空气、水资源等多个领域。通过评估明确项目对环境的具体影响,可以合理制定生态补偿方案,并监督其落实情况。本文以吉林“大安700兆瓦风电+光伏+光热220千伏送出工程”为案例,总结了项目对生态的影响,并制定了相应的补偿和恢复措施,确保项目实施后生态环境能得到及时修复和有效管理。
{"db_type":"CJFDREF","db_name":"期刊","reference_articles":[{"unit":"电气技术与经济","flag":"[J]","issue":"09","year":2023,"author":"卢璐;肖莹;吴雪;诸德律","index":1,"title":"电网项目环境影响评价与竣工环保验收的管理思考"},{"unit":"清洗世界","flag":"[J]","issue":"04","year":2023,"author":"黄美根","index":2,"title":"电网建设项目竣工环保验收中常见的问题及应对建议"},{"unit":"电力科技与环保","flag":"[J]","issue":"06","year":2019,"author":"李辉;陈涛;张小庆;陈曦;邓丽;朱江平","index":3,"title":"电网规划环境影响评价体系构建研究与实践"}],"articles_count":3}
0
Views
36
下载量
CSCD
Publicity Resources
Related Articles
Related Author
Related Institution