您当前的位置:
首页 >
文章列表页 >
Improved Measures of Removing Crack on Inside Hole of Malleabl Cast Iron NUT-2 Wire Cleat
更新时间:2025-11-18
    • Improved Measures of Removing Crack on Inside Hole of Malleabl Cast Iron NUT-2 Wire Cleat

    • Issue 3, Pages: 38-41(1993)
    • Published:1993

    移动端阅览

  • Chen Jiyu. Improved Measures of Removing Crack on Inside Hole of Malleabl Cast Iron NUT-2 Wire Cleat[J]. 1993, (3): 38-41. DOI:

  •  
  •  

0

Views

10

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Original Discussion on solving oil Leak in Electrical Equipment
Cause and Countermeasures for Burn-out of Thrust-bearing in Main Oil Pump of Type N75-90/535 Turbine
Improvement and Measure of Starting Techniques with Intermedate Pressure Cylinder on Homemade 200MW Turbine
Improvement on 200MW Turbine Set
Application of Acid proof Colloid in Electric Power Construction

Related Author

Zhang Zongyu(Sichuan Electric Power Administratiom 610061
刘波
Lu Jikui Liu Bo
Xia Liuzkang
Zhong Chengqli
Sun Neijian
Wen Yunzhong
陈涛

Related Institution

四川省电力工业局
  华莹山电厂 635214  
Huayingshan Power Plant
Chongqing Power Plant
Baima Power Plant
0