您当前的位置:
首页 >
文章列表页 >
Improvement and Measure of Starting Techniques with Intermedate Pressure Cylinder on Homemade 200MW Turbine
更新时间:2025-11-18
    • Improvement and Measure of Starting Techniques with Intermedate Pressure Cylinder on Homemade 200MW Turbine

    • Issue 4, Pages: 19-25(1993)
    • Published:1993

    移动端阅览

  • Xia Liuzkang. Improvement and Measure of Starting Techniques with Intermedate Pressure Cylinder on Homemade 200MW Turbine[J]. 1993, (4): 19-25. DOI:

  •  
  •  

0

Views

9

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Original Discussion on solving oil Leak in Electrical Equipment
Cause and Countermeasures for Burn-out of Thrust-bearing in Main Oil Pump of Type N75-90/535 Turbine
Improved Measures of Removing Crack on Inside Hole of Malleabl Cast Iron NUT-2 Wire Cleat
Improvement on 200MW Turbine Set
Improvement on Oil System of Feed Water Pump and Hydraulic Coupling

Related Author

Zhang Zongyu(Sichuan Electric Power Administratiom 610061
刘波
Lu Jikui Liu Bo
Chen Jiyu
Zhong Chengqli
Liu Bo
Li Changguo
仝世渝

Related Institution

四川省电力工业局
  华莹山电厂 635214  
Huayingshan Power Plant
Chengdu Electric Power Fitting Plant
Baima Power Plant
0