您当前的位置:
首页 >
文章列表页 >
Improvement on 200MW Turbine Set
更新时间:2025-11-18
    • Improvement on 200MW Turbine Set

    • Issue 4, Pages: 4-8(1993)
    • Published:1993

    移动端阅览

  • Zhong Chengqli. Improvement on 200MW Turbine Set[J]. 1993, (4): 4-8. DOI:

  •  
  •  

0

Views

13

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Disccussion on Improvement for Starting Technique of Intermediate Pressure Cylinder of 200MW Steam Turbine
Dynamic Parameter Diagnosis and Simulation of 200 MW Turbine Control System at Load Dump
Original Discussion on solving oil Leak in Electrical Equipment
Cause and Countermeasures for Burn-out of Thrust-bearing in Main Oil Pump of Type N75-90/535 Turbine
Improved Measures of Removing Crack on Inside Hole of Malleabl Cast Iron NUT-2 Wire Cleat

Related Author

仝世渝
唐能凡
Zhang Wenjin Tang Nengfan Tong Shiyu
张济蓉
Zhang Yaping Zhang Jirong
Zhang Zongyu(Sichuan Electric Power Administratiom 610061
刘波
Lu Jikui Liu Bo

Related Institution

Chongqing Electric Power Plant ) Keywords MW steam turbine intermediate pressure cylinder starting improvement suggestion
  四川电力科学试验研究所 610072  
Sichuan Test & Research Institute of Electrical Power
四川省电力工业局
  华莹山电厂 635214  
0