四川电力局
Published:1994
移动端阅览
[1]陈嵩峥.灰水闭路循环的必要性[J].四川电力技术,1994(01):38-40.
Chen Songzheng. Necessity of Closed Recirculation for Ash Water[J]. 1994, (1).
[1]陈嵩峥.灰水闭路循环的必要性[J].四川电力技术,1994(01):38-40. DOI:
Chen Songzheng. Necessity of Closed Recirculation for Ash Water[J]. 1994, (1). DOI:
江油电厂三期扩建工程为引进2×330MW机组,其水力除灰系统冲灰管系结垢和灰水pH值超标。提出不更改法国除灰工艺流程,用冲灰管前鼓炉烟、灰场排水回收添加阻垢剂的灰水闭路循环方案,并从节水和环境保护的角度论证该闭路循环的必要性.
0
Views
16
下载量
CSCD
Publicity Resources
Related Articles
Related Author
Related Institution