您当前的位置:
首页 >
文章列表页 >
Analysis and Reparing of 19 Level Shroud Accident of #2 Steam Turbine
更新时间:2025-11-18
    • Analysis and Reparing of 19 Level Shroud Accident of #2 Steam Turbine

    • Issue 3, (1997)
    • CLC: TK268
    • Published:1997

    移动端阅览

  • Chen Lin. Analysis and Reparing of 19 Level Shroud Accident of #2 Steam Turbine[J]. 1997, (3). DOI:

  •  
  •  

0

Views

29

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Test of Forced Cooling on Type N100-90/535 Steam Turbine
Adjustment of Speed Governing System of Type N100-50/535 Turbine
Dynamic Parameter Diagnose of Turbine Control System
Chemical Cleaning of Condenser of Steam Turbine
Analysis on Loss of Pressure in Oil System for Shutdown of Electric Oil Pump During Mediumminiature Steam Turbiue Start up

Related Author

Zhang MingYue
Jjang Guangquan
Zhang Yaping
Qian Jun
Xu Qihuan
Mou Yingquan
Li shuchun
Hong Ruchun

Related Institution

Huayingshan Power Plant
Sichuan Test & Research Institute of Electrical Power
Daxigou Power Plant
Wuchang Cogemeration Power Plant
Chongqing Power Plant
0