您当前的位置:
首页 >
文章列表页 >
To Built Added Sub dam by Ash in Tongguanxi Ash Pond in Douba Power Plant
更新时间:2025-11-18
    • To Built Added Sub dam by Ash in Tongguanxi Ash Pond in Douba Power Plant

    • Issue 5, (1997)
    • CLC: TU271.1
    • Published:1997

    移动端阅览

  • Fan Yunfei. To Built Added Sub dam by Ash in Tongguanxi Ash Pond in Douba Power Plant[J]. 1997, (5). DOI:

  •  
  •  

0

Views

22

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Project Design and Operation of Jinsu Power Plant
Compilation and Application of Design Calculating Program to Venturi Water Film Dust Precipitator
Common Use Topology Design Of Microcomputer Local Area Networks
52kV气体绝缘开关柜的安全可靠性
Important Problems in Preliminary Selecting Mode of Hydroelectric Set for Hydroelectric Power Station

Related Author

Fang Liming
陈建春
Fan Liming Chen Jianchun
Liu Yi
爱里奇·松勒斯基因
哈罗德·芬克
Ou Xuexiu
Xie Lan

Related Institution

Sichuan Electric Power Investigation and Design Institute
  四川电力工业局勘察设计院 610016  
Sichuan Electric Power Investigation and Design Institute
Chongqing Power Plant
Sichuan Test and Research Institute of Electrical Power ) Keywords hydroelectric set efficiency type selection design hydraulic head annual electric energy generating capacity
0