您当前的位置:
首页 >
文章列表页 >
Cause and Treatment of Front Steam Seal Defect of N75-90 Generating Set
更新时间:2025-11-18
    • Cause and Treatment of Front Steam Seal Defect of N75-90 Generating Set

    • Issue 6, (1998)
    • CLC: TK263.2
    • Published:1998

    移动端阅览

  • Zou Xianming. Cause and Treatment of Front Steam Seal Defect of N75-90 Generating Set[J]. 1998, (6). DOI:

  •  
  •  

0

Views

8

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Way and Measures of Starting with Intermediate Pressure Cylinder on 330MW Steam Turbo Generater Set
Coal Leakage and Improvement of Medium Speed Pulverizer
Analysis on Cracks of Elbow Bend in 1 Economizer of Type DG 220/9.8-4 Boiler
Improvement of Ventilation System of Hydroelectric Generatror
Economy of Energy Consumption for Binhai Power Plant

Related Author

Zhang Jianhua
Rong Yuehe
Guo Fengshu
Tao Lipei
Zhang Xuehe
Zhang Yuhui
杜永远
Zhao Taoping Du Yongyuan

Related Institution

Jiangyou Power Plant
Panzhihua Power Plant
Baihe Power Plant
Sichuan Test & Research Institute of Electrical Power
Binhai Power Plant, Jiangsu 2245o0
0