您当前的位置:
首页 >
文章列表页 >
Y2K in Sichuan Electric Power Dispatching Automatic System
更新时间:2025-11-18
    • Y2K in Sichuan Electric Power Dispatching Automatic System

    • Issue 3, (1999)
    • CLC: TM734
    • Published:1999

    移动端阅览

  • Yang Jiashi. Y2K in Sichuan Electric Power Dispatching Automatic System[J]. 1999, (3). DOI:

  •  
  •  

0

Views

25

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Primary Discussion on Solving the Question of Y2K
Non-electric Quantities Monitoring of Water-turbine set
Computer Application in Design and Management of Electric Utility
Crack Treatment of Main Steam Vale Body of Generating Set in Pangang Power Plant
Description on Developing MIS System of Jiangyou Power Plant

Related Author

Xing Shiqiang Jian Lin
蹇林
Yang Qizhong
Xia Xiaoming Ou Yang
欧杨
Xu Yanqiong
张彤昊
Li Mei Gao Zhaochuan Liu Binxing

Related Institution

Xinzhuan Power Plant
Sichuan Test & Research Institute of ElectriicalPower
Sichuan Test and Research Institute of Electric Power
Pangang Power Plant ) Zhang Donghao
四川电力试验研究院
0