您当前的位置:
首页 >
文章列表页 >
水电站Y2K问题测试与防范工作
更新时间:2025-11-18
    • 水电站Y2K问题测试与防范工作

    • Issue S1, Pages: 62-63(2000)
    • CLC: TP309
    • Published:2000

    移动端阅览

  • 王竹. 水电站Y2K问题测试与防范工作[J]. 2000, (S1): 62-63. DOI:

  •  
  •  

0

Views

8

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Inviting Tenders for Large Size Hydroelectric Station and Making Technical Specifications of Its Unit
Development of Water Turbine Runner for Improvement of Shizitan Hydroelectric Station
Application and Monitoring of Abrasion Resistance Hydraulic Oil in Hydroelectric Power Plant
电力管理信息系统的测试与验收
渔子溪电站水轮机组技术改造

Related Author

Ou Xuexiu
Huang Yisheng
Song Yapeng
金娜
吴民
彭建华
黄群
胥洪远

Related Institution

Sichuan Test & Research Institute of Electrical Power
Huaneng Taipingyi Hydroelectric Power Plant,)Na
映秀湾发电总厂
四川华能太平驿水电厂映秀湾发电总厂
四川电力试验研究院
0