您当前的位置:
首页 >
文章列表页 >
500kV洪沟变电站高抗振动研究及处理
更新时间:2025-11-18
    • 500kV洪沟变电站高抗振动研究及处理

    • Issue 6, Pages: 14-15+46(2001)
    • CLC: TM47
    • Published:2001

    移动端阅览

  • 聂鸿宇, 朱康, 胡灿. 500kV洪沟变电站高抗振动研究及处理[J]. 2001, (6): 14-15+46. DOI:

  •  
  •  

0

Views

80

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Discussion on Front Bearing Box Vibration of 50MW Turbine in Chongqing Power Plant
Discussion on Way of Solving Vibration Problem for Ash Deposition in Induced Draft Fan of 200MW Boiler
江油电厂330MW机组启动过程假振动现象分析判断及消除
Diagnosis and Elimination of Oil Whip on the Turbo-generator
Vibration Removal of Primary Fan of Boiler No.8 in JiangYou Power Plant

Related Author

Mou Yingquan
杨南府
Lu Zhihou
张振东
黄同华
王恒
Ling Tingliang Wang Heng
Chen Xiumei

Related Institution

Chongqing Power Plant
  641005  
  白马发电厂 710032  
Xian Thermal Power Engineering Research Institute ) Yang Lanfu
四川省电力工业局调整试验所
0