您当前的位置:
首页 >
文章列表页 >
新安装的电能表为什么转“快”了
更新时间:2025-11-18
    • 新安装的电能表为什么转“快”了

    • Issue 3, Pages: 44-49(2002)
    • CLC: TM933.4
    • Published:2002

    移动端阅览

  • 胡刚, 赵文, 游俊刚. 新安装的电能表为什么转“快”了[J]. 2002, (3): 44-49. DOI:

  •  
  •  

0

Views

8

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Boiler Fuel Control System with Programmable Regulater in 200MW Unit
江油电厂330MW机组启动过程假振动现象分析判断及消除
New Current Transformer for Generator Outlet
Uncertainty of Measurement of Verification Apparatus of Transformer And Its Verification Test
Measurement Error Related to Secondary Voltage Drop of Voltage Transformer

Related Author

Xu Tianfang
张振东
Jiang Bo
闻学勤
Jiang Bo Wen Xueqin
Zhang Hong
Zhao Fushan
Xie Wenjun

Related Institution

Chongqing University
四川省电力工业局调整试验所
Sichuan Test and research Institute of Electrical Power ) Keywords current transfomer error two stage compensation measurement detection
Sichuan Test and Research Institute of Electrical Power ) Keywords transformer verification apparatus uncertainty error
Chongqing Electric Power Bureau ) Keywords voltage transformer secondary circuit voltage drop electric energy measurement errors
0