您当前的位置:
首页 >
文章列表页 >
热力发电厂水泵密封装置的改造
更新时间:2025-11-18
    • 热力发电厂水泵密封装置的改造

    • Issue 1, Pages: 6-12(2003)
    • CLC: TH31
    • Published:2003

    移动端阅览

  • 彭懿. 热力发电厂水泵密封装置的改造[J]. 2003, (1): 6-12. DOI:

  •  
  •  

0

Views

38

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Improvement of Induced Draught Fan for Power Plant Fired Lower Grade Coal
Repair Technique for Shaft of 40 15 Water Pump
Transformation of Cool Furnace Bottom Into Semi thermal Furnace Bottom in SG-39/450 Model Medium Pressure Slag tap Boiler
白马电厂灰渣水闭路循环系统技术改造可行性研究
宝珠寺水力发电厂机组推力外循环系统改造

Related Author

Qi Enshi
Li Dairong
Li Yong
高廷源
蒋崇海
黄韶民
宾裕昌
隆重

Related Institution

Guangxi HeShan Power Plant
Hemenkou Power Plant ) Keywords water pump axle hot pressing technique
Hemenkou Power Plant ) Keywords slag tap boiler transformation of cool furnace bottom into semi thermal furnace bottom
四川省电力公司科技环保部
宝珠寺水力发电厂
0