Liu Weihong Yu Guoqiang. Reformation for Capacity Expansion of 50 MW Turbo-generator Set[J]. 2005, (1): 18-19.DOI:
Reformation for Capacity Expansion of 50 MW Turbo-generator Set
摘要
介绍 5 0MW汽轮发电机组的增容改造的实施方案及运行情况。通过改造
机组的发电出力增加了 1 0MW
同时降低了汽耗、减少煤耗
大大提高机组的安全性与经济性
Abstract
The reformation scheme of capacity expansion for 50MW turbo-generator set and the operation condition after the reformation have been introduced. Through the reformation
the generated output of this set has increased by 10MW
and at the same time
steam consumption and coal consumption have been reduced
which has enhanced the security and economy of the set greatly.