您当前的位置:
首页 >
文章列表页 >
Fault Determination for Partial Discharge Test of No.13 Main Transformer in Tong-jiezi Hydroelectric Power Station
更新时间:2025-11-18
    • Fault Determination for Partial Discharge Test of No.13 Main Transformer in Tong-jiezi Hydroelectric Power Station

    • Issue 6, Pages: 20-21+31(2005)
    • CLC: TM83
    • Published:2005

    移动端阅览

  • Nie Hongyu. Fault Determination for Partial Discharge Test of No.13 Main Transformer in Tong-jiezi Hydroelectric Power Station[J]. 2005, (6): 20-21+31. DOI:

  •  
  •  

0

Views

40

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Discussion on Tap Adjustment and Economic Operation of Transformer
Analysis of reasons on transformer’s tripping for 500kV HongGou Substation"7.31
Partial Discharge Condition Monitoring System of Hydro-generator
Prediction and Diagnosis Method for Insulation Failure of Transformer
Treatment for Dielectric Loss Increment of Transformer Insulating Oil

Related Author

Jiang Zhifa
徐斌
胡国根
刘念
Li Bo Liu Nian Hu Guogen
Deng Peng
Wang Min
刘青丽

Related Institution

Neijian Electric Power Administration
自贡电业局
  四川大学电气信息学院 四川成都610065  
  四川大学电气信息学院  
德阳电业局
0