四川电力设计咨询有限责任公司 四川成都610061
Published:2006
移动端阅览
[1]孟珊.输电线路设计阶段如何控制工程造价[J].四川电力技术,2006(01):61-62.
Meng Shan. Superficial Discussion on How to Control Project Cost in Design Stage[J]. 2006, (1): 61-62.
[1]孟珊.输电线路设计阶段如何控制工程造价[J].四川电力技术,2006(01):61-62. DOI:
Meng Shan. Superficial Discussion on How to Control Project Cost in Design Stage[J]. 2006, (1): 61-62. DOI:
以设计的二滩-石板箐500 KV送电线路工程为例
从线路本体工程出发
分析在工程设计阶段如何控制工程造价。
Taking the designed Ertan-Shi Banqing 500kV transmission line project for example and proceeding from the project of line proper
how to control project cost in design stage has been analyzed.
0
Views
112
下载量
1
CSCD
Publicity Resources
Related Articles
Related Author
Related Institution