您当前的位置:
首页 >
文章列表页 >
16D12型功率表烧毁原因分析及改进
更新时间:2025-11-18
    • 16D12型功率表烧毁原因分析及改进

    • Issue 2, Pages: 34-35(2006)
    • CLC: TM933.3
    • Published:2006

    移动端阅览

  • 徐丰民. 16D12型功率表烧毁原因分析及改进[J]. 2006, (2): 34-35. DOI:

  •  
  •  

0

Views

14

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Improvement and Measure of Starting Techniques with Intermedate Pressure Cylinder on Homemade 200MW Turbine
Improvement on Oil System of Feed Water Pump and Hydraulic Coupling
Problem on Choice of Neutral Zero Sequence Protection of Transformer
Analysis and Repair of Large Electric Motor Burnout in Two Phases Starting
Disccussion on Improvement for Starting Technique of Intermediate Pressure Cylinder of 200MW Steam Turbine

Related Author

Xia Liuzkang
Liu Bo
Li Changguo
Yuan Ting
仝世渝
唐能凡
Zhang Wenjin Tang Nengfan Tong Shiyu
Yang Guanghua Li Pu

Related Institution

Chongqing Power Plant
Huayunshan Power Plant
South Sichuan Dispatching Bureau of Electric power ) Keywords transformer zero sequence protection improvement problem
Huayingshan Power Plant ) Keywords asynchronous motor open phase operation burnout repair
Chongqing Electric Power Plant ) Keywords MW steam turbine intermediate pressure cylinder starting improvement suggestion
0