通过分析影响变电站倒闸操作速度的原因
旨在与同行交流
找出针对性的措施
不断提高倒闸操作的速度
以利于安全、快速倒换电网运行方式
为电网的安全运行奠定基础。
The causes influencing the switching operation speed in substation are analyzed
for the purpose of exchanging the experiences
finding the corresponding measures and enhancing the speed of switching operation continuously
it is good for switching the operation of power grid safely and quickly and it can lay a foundation for the safe operation of power grid.