Huang Yeheng. Domestic Transformation of Non-segregated Buses in Auxiliary Power System[J]. 2007, (3): 65-69.DOI:
Domestic Transformation of Non-segregated Buses in Auxiliary Power System
摘要
针对秦山第三核电厂共箱母线因绝缘结构设计不合理导致启备变和高厂变多次跳闸的缺陷
为提高两路厂外电源的供电可靠性
并提高电站的经济效益
对两台机组厂用电系统的共箱母线进行了彻底的技术改造。改造后的试验结果和运行情况表明
陶瓷绝缘子型/电缆型混合共箱母线已从根本上消除了恶劣天气或沿线较大温差对共箱母线的影响
满足全天候运行的要求。
Abstract
Because of the unreasonable design on insulation construction
the non-segregated buses of Third Qinshan Nuclear Power Plant suffer many faults
which cause the startup & backup transformer and the unit service transformer tripping frequently.In order to improve the reliability of the off-site power supplies and the economic benefit
the thorough technical renovation is carried out for non-segregated buses of auxiliary power system of two units.The test results and the operating condition after the renovation show that the combined non-segregated buses of porcelain insulator and cable have not only completely removed the bad effect of severe weather and high temperature difference along the line
but also met the requirement of all weather operation.