Li Lin Zhang Liyi. Comparison among Renovation Schemes of Electric Braking of Water-turbine Generator Set[J]. 2007, (3): 61-63.DOI:
Comparison among Renovation Schemes of Electric Braking of Water-turbine Generator Set
摘要
阐述了水轮发电机电气制动系统的工作原理及实现途径
给出了电制动的各种改造方案
并结合电站励磁系统
并对各方案具体原理、实现及特点进行深入探讨
从技术、经济、实现的难易程度等多方面进行了比较
通过对水轮发电机制动改造
可改善机械制动系统的工况和发电机的运行条件
并获得经济效益和社会效益。
Abstract
The working principle and implementation method of electric braking system of water-turbine generator set are discussed
several renovation projects of electric braking are proposed
the working principle
implementation method and characteristics with comprehensive considerations of excitation system in hydraulic power station is discussed and compared in many ways such as technique
economy and difficulty of practice.Through renovation of electric braking system of water turbo-generator
the operating conditions of generator and mechanical braking system are improved
and the economical benefit and social benefit are obtained.