杨瑞棠. Cabling and Installation for 500kV Oil-filled Cable with a highdrop of Level[J]. 1996, (2): 1-7+12.DOI:
Cabling and Installation for 500kV Oil-filled Cable with a highdrop of Level
摘要
总结了500kV200m落差充油电缆的施工
包括:敷设前的准备工作;敷设方法;终端的制作;竣工后的试验;施工工期以及对施工质量的评价等。
Abstract
This paper sums up the installed experiences of 500kV oil-filled cable with 200m Large height of drop including the preparations before installation . methodes of installation
make-up of terminals
test after installation
construction duration and constructive quality evaluation