The case of automatic rapid load-sheding of domestic 300MW unit after boiler MFT is introduced in this paper. The probable security problems resulting from not tripping turbine immediately after boiler MFT are proposed along with the relative measures. Also
both advantages and disadvantages of the measures are investigated preliminarily.