Analysis of steam pipe blowing scheme for 1952t/h super-critical combined-circulation boiler
摘要
介绍了国产首台1 952.21 t/h超临界复合循环锅炉的设计特性
比较了锅炉稳压吹管和蓄能降压吹管方式的特点
分析了锅炉吹管出现的问题
提出了稳压吹管的要点。
Abstract
This article introduces the design pattern of the first domestic 1952.21t/h super-critical combined-circulation boiler and compares the features of steady pressure pipe blowing scheme with that of energy storage reduced pressure pipe blowing scheme.The problems existing in boiler pipe blowing are analyzed and the outlines of boiler pipe blowing are presented.