您当前的位置:
首页 >
文章列表页 >
Fault Analysis and disintegration investigation of an imported 500kV transformer
更新时间:2025-11-18
    • Fault Analysis and disintegration investigation of an imported 500kV transformer

    • Issue 3, Pages: 32-34(2006)
    • CLC: TM407
    • Published:2006

    移动端阅览

  • MA Li~1, LIU Wei-dong~1, WANG Ying~2, et al. Fault Analysis and disintegration investigation of an imported 500kV transformer[J]. 2006, (3): 32-34. DOI:

  •  
  •  

0

Views

29

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Application of Adaptive Genetic Algorithm to Transformer Ultra-High-Frequency PD Pattern Recognition
Study on transformer capacity testing equipment based on impedance voltage method
The application of on-line DGA analysis for transformer oil
Simulation analysis on high frequency transient for CVT
A new moisture content measurement method for oil-immersed transformer insulation plate

Related Author

WANG Guo-li~2
ANG Hai-yue~1
LI Lin~2
ZHOU Wen-sheng~1
LIU Xiao-ling
CHEN Hong3
CAI Zu-an2
YAO Xiao-jian1

Related Institution

  广东深圳518000  
Graduate School of Shenzhen, Tsinghua University
Changsha Electric Power Supply Bureau
Huaneng Chaohu Power Plant
Ningxia Power Corporation Shizuishan Power Supply Bureau
0