您当前的位置:
首页 >
文章列表页 >
Controlling Scheme for operation with service power after units fast cut back in Xinhua DEH-ⅢA System
更新时间:2025-11-18
    • Controlling Scheme for operation with service power after units fast cut back in Xinhua DEH-ⅢA System

    • Issue 4, Pages: 21-23(2006)
    • CLC: TK323
    • Published:2006

    移动端阅览

  • ZHANG Yi-fei. Controlling Scheme for operation with service power after units fast cut back in Xinhua DEH-ⅢA System[J]. 2006, (4): 21-23. DOI:

  •  
  •  

0

Views

63

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis of negative differential temperature between upper and lower cylinder of HP Cylinder in 362MW steam turbine and its treatment
Application of time-series pattern discovery algorithm on turbine monitoring
Energy saving modification of steam turbine pass-through section and application effect
Application on finite element numerical modeling method in optimization of turbine start-up characteristics
Development and application of turbine performance test wireless data acquisition system

Related Author

HAN Yang
GAN Yong
LI Yuan-Sheng
LI Ming
HUANG Pi-wei
JIAO Qing-feng
QIU Ying-jun
HUANG Lai

Related Institution

Huaneng Yueyang Power Generation co.,Ltd
  华能湖南岳阳发电有限责任公司 湖南岳阳414002  
Guangdong Yuehua Power Company Ltd.
Hunan Electric Power Test and Research Institute
  湖南省电力公司试验研究院 湖南长沙410007  
0