1. 湖南东江水电厂
2. 湖南省电力试验研究院
Published:2006
移动端阅览
[1]李世甲,毛文奇.东江水电厂220kV GIS检修初探[J].湖南电力,2006(05):52-54.
LI Shi-jia~1, MAO Wen-qi~2. Discussion on overhaul of 220kV GIS in Dongjiang hydropower plant[J]. 2006, (5): 52-54.
[1]李世甲,毛文奇.东江水电厂220kV GIS检修初探[J].湖南电力,2006(05):52-54. DOI:
LI Shi-jia~1, MAO Wen-qi~2. Discussion on overhaul of 220kV GIS in Dongjiang hydropower plant[J]. 2006, (5): 52-54. DOI:
分析了东江水电厂220 kV气体绝缘全封闭组合电器(G IS)检修中存在的一些问题
并针对这些问题进行了初步探讨。
Problems existing in overhaul of 220kV GIS in Dongjiang hydropower plant were analyzed and the overhaul process was discussed.
0
Views
39
下载量
1
CSCD
Publicity Resources
Related Articles
Related Author
Related Institution