您当前的位置:
首页 >
文章列表页 >
Design features of start-up system of supercritical boiler in Xiang-tan project Ⅱ
更新时间:2025-11-18
    • Design features of start-up system of supercritical boiler in Xiang-tan project Ⅱ

    • Issue 2, Pages: 32-35(2007)
    • CLC: TK229.2
    • Published:2007

    移动端阅览

  • WANG Zheng-hua, FU Jing-xi. Design features of start-up system of supercritical boiler in Xiang-tan project Ⅱ[J]. 2007, (2): 32-35. DOI:

  •  
  •  

0

Views

84

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research and application on reducing the flue gas temperature of boilers
Operation analysis of imported L-type flame fired boiler
Reconstruction of superheat steam temperature control system for domestic 600MW unit
Installation quality inspection technology and engineering application of 600MW super critical boiler
Influence of coal quality on boiler operation economy and countermeasures

Related Author

ZHOU Nai-jun
PEI Hai-ling
LIU Jian-duan
PAN Pin
ZHANG Qi
WEN De-pu
TAN Wei
SHAN Hong2

Related Institution

  中南大学能源与动力工程学院 湖南长沙410083  
Institute of Energy and Power Engineering,Central South University
  华能日照电厂 山东日照276800  
Huaneng Rizhao Power Plant
  安徽淮南平圩发电有限责任公司 安徽淮南232089  
0