您当前的位置:
首页 >
文章列表页 >
Sliding pressure operation after modification of steam passagepart of No.3 unit in Jinzhushan power plant
更新时间:2025-11-18
    • Sliding pressure operation after modification of steam passagepart of No.3 unit in Jinzhushan power plant

    • Issue 4, Pages: 16-18(2007)
    • CLC: TK267
    • Published:2007

    移动端阅览

  • QIU Ying-jun1, HUANG Pi-wei1, YAN Jian-xin2, et al. Sliding pressure operation after modification of steam passagepart of No.3 unit in Jinzhushan power plant[J]. 2007, (4): 16-18. DOI:

  •  
  •  

0

Views

48

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on test of large steam turbine units optimal operation and economy analysis
Economy performance analysis of sliding pressure operation of 300MW steam turbine
Analysis and Treatment of Unit Abnormal Vibration in the Loading Process
Valve Switching Test of Imported 300MW Generation Unit and Its Economy Analysis under Single- and Sequence-Valve Operation
Status quo of nuclear power in Hunan and technical analysis of conventional island of steam turbine system

Related Author

LI Ming
HUANG Pi-wei
JIANG Bei-hua
QIU Ying-jun
XU Shu
JIAO Qing-feng
XU Shu
ZENG Qingfeng

Related Institution

  湖南省电力公司试验研究院 湖南长沙410007  
Hunan Electric Power Test and Research Institute
Huaneng Hunan Yue Yang Power Generation Co.,Ltd.
  湖南益阳413000  
Hunan Yiyang Power Generation Co.Ltd.
0