您当前的位置:
首页 >
文章列表页 >
Study on scheme of connecting Yangtianhu wind farm into Hunan power grid
更新时间:2025-11-18
    • Study on scheme of connecting Yangtianhu wind farm into Hunan power grid

    • Issue 4, Pages: 12-14(2008)
    • CLC: TM614
    • Published:2008

    移动端阅览

  • WANG Zhen-yu. Study on scheme of connecting Yangtianhu wind farm into Hunan power grid[J]. 2008, (4): 12-14. DOI:

  •  
  •  

0

Views

72

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Study on connecting system scheme of Hengyang Photovoltaic Power Station
Analysis on Maximum Allowable Access Capacity of Distributed Power Source Based on Voltage Stability
Influences of 300MVar synchronous condensers on the stabilities of Hunan power grid
Study on Reactive Power Compensation Characteristics of Large Capacity STATCOM in 500 kV Substation
Research on Synchronous Compensator for Voltage Support of HVDC Transmission System

Related Author

WANG Xiang-Ru
WANG Zhen-Yu
XU Jie
YU Jialin
LI Chun
ZHAO Fei
LIU Wei
GUO Hu

Related Institution

China Energy Engineering Group Co.,Ltd Hunan Electirc Power Design Institute
State Grid Jiaxing Power Supply Company
State Grid Hunan Electric power Corporation Research Institute
State Grid Hunan Electric Power Coompany Limited Maintenance Company
Changsha University of Science and Technology
0