Study on scheme of connecting Yangtianhu wind farm into Hunan power grid
|更新时间:2025-11-18
|
Study on scheme of connecting Yangtianhu wind farm into Hunan power grid
Issue 4, Pages: 12-14(2008)
作者机构:
湖南省电力勘测设计院
作者简介:
基金信息:
DOI:
CLC:TM614
Published:2008
稿件说明:
移动端阅览
[1]王振宇.仰天湖风电场接入系统方案研究[J].湖南电力,2008(04):12-14.
WANG Zhen-yu. Study on scheme of connecting Yangtianhu wind farm into Hunan power grid[J]. 2008, (4): 12-14.
[1]王振宇.仰天湖风电场接入系统方案研究[J].湖南电力,2008(04):12-14.DOI:
WANG Zhen-yu. Study on scheme of connecting Yangtianhu wind farm into Hunan power grid[J]. 2008, (4): 12-14.DOI:
Study on scheme of connecting Yangtianhu wind farm into Hunan power grid
摘要
仰天湖风电场是湖南省第1座示范性风电场
位于郴州市北湖区西南的方向
计划于2008年初建成投产。研究表明
该风电场送电蓉城220 kV变供电区、并通过1回110 kV线路接入系统是适宜的。
Abstract
Yangtianhu wind farm is the first demonstration wind farm in Hunan.Located at Beihu district of Chenzhou
the wind farm will put into operation in 2008.It was proved properly that the wind farm was connected into Hunan power grid by one 110kV transmission line.