您当前的位置:
首页 >
文章列表页 >
Optimization and realization of protection logic of boiler tripping without turbine tripping for 600MW subcritical power unit
更新时间:2025-11-18
    • Optimization and realization of protection logic of boiler tripping without turbine tripping for 600MW subcritical power unit

    • Vol. 29, Issue 1, Pages: 27-29+51(2009)
    • CLC: TM621
    • Published:2009

    移动端阅览

  • YUAN Yan-chun, QIU Xin-li. Optimization and realization of protection logic of boiler tripping without turbine tripping for 600MW subcritical power unit[J]. 2009, 29(1): 27-29+51. DOI:

  •  
  •  

0

Views

56

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Discussion of Automatic Rapid Load-Sheding of 300MW Unit after Boiler MFT
Analysis and optimization of quality of inner cooling water in 362.5MW generators
Research on test of large steam turbine units optimal operation and economy analysis
Analysis and optimization of incipient faulty prediction unit of large-sized oil-filled equipments in converter station
Design optimization of connecting pipe of condenser rear water chambers for large scale steam turbines

Related Author

肖大雏
Chen Weibin Xiao Dachu
ZHONG Lian
JIA Xiuying
ZHENG Wei-de
TUO Wen-qun
QIU Ying-jun
LI Ming

Related Institution

  武汉大学 湖北武汉430072  
Wuhan University
  华能湖南岳阳发电有限责任公司 湖南岳阳414002  
Huaneng Yueyang Power Generation co.,Ltd
  湖南省电力公司试验研究院 湖南长沙410007  
0