针对某电厂地下厂房下游侧岩锚梁6号裂缝性状、产生原因及与厂房开挖相关性进行分析。结合周边建筑物的情况
对裂缝的稳定性、岩锚梁安全性进行分析评价。
The paper mainly analyzes the crack state of No.6 anchor beam of underground workshop downstream
crack cause and workshop excavation relativity.Combined with the condition of peripheral building
the stability of crack and the security of anchor beam is analyzed.