您当前的位置:
首页 >
文章列表页 >
Safety analysis of live working on 500kV double-circuit transmission line of Xiangyun
更新时间:2025-11-18
    • Safety analysis of live working on 500kV double-circuit transmission line of Xiangyun

    • Vol. 30, Issue 6, Pages: 23-26+30(2010)
    • CLC: TM75
    • Published:2010

    移动端阅览

  • JIANG Zheng-long1, GONG Zheng-xiong2, ZHAO Chun1, et al. Safety analysis of live working on 500kV double-circuit transmission line of Xiangyun[J]. 2010, 30(6): 23-26+30. DOI:

  •  
  •  

0

Views

111

下载量

5

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Study on insulating transposition slide for live working
Experimental Research on Safety Early Warning System of Live Working Based on Human Physical Signs
Optimization of Calculation Model of Potential Transfer Current of Live Working on ±800 kV Transmission Lines
Design of Floating Foreign Matter Removal Device for 10 kV Overhead Distribution Lines Based on Unmanned Aerical Vehide

Related Author

HE Longfei
CHEN Jianping
LONG Yang
XIONG Zixuan
LI Wenbo
LI Jinliang
YANG Miao
LONG Chenhai

Related Institution

State Grid Hunan Electric Power Corporation Live Operations Center
State Grid Hunan Electric Power Company Limited Research Institute
State Grid Yongzhou Power Supply Company
State Grid Hunan Maintenance Company
State Grid Changsha Power Supply Company
0