您当前的位置:
首页 >
文章列表页 >
Finite element analysis of thermal stress of domestic 600MW supercritical steam turbine under cold start-up
更新时间:2025-11-18
    • Finite element analysis of thermal stress of domestic 600MW supercritical steam turbine under cold start-up

    • Vol. 30, Issue 6, Pages: 8-11(2010)
    • CLC: TK261
    • Published:2010

    移动端阅览

  • GUO Jing-jing1, JIAO Qing-feng2, BIAN Shuang1, et al. Finite element analysis of thermal stress of domestic 600MW supercritical steam turbine under cold start-up[J]. 2010, 30(6): 8-11. DOI:

  •  
  •  

0

Views

117

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Study on the Transition Units in Integrated solution of Hydropower Station Powerhouse Structure Using the Finite Element Method
Sliding pressure operation after modification of steam passagepart of No.3 unit in Jinzhushan power plant
Installation quality inspection technology and engineering application of 600MW super critical boiler
Research on test of large steam turbine units optimal operation and economy analysis
Status quo of nuclear power in Hunan and technical analysis of conventional island of steam turbine system

Related Author

ZHOU You-ting
ZHAO Yue-fan2
YAN Jian-xin2
HUANG Pi-wei1
QIU Ying-jun1
SHAN Hong2
JIAO Qing-feng1
LONG Yi1

Related Institution

Central South Institute for Survey & Design of Hydroelectric Power
Datang Leiyang Power Plant,Leiyang
DaTang Xiangtan Power Generation Co,Ltd
  湖南省电力公司试验研究院 湖南长沙410007  
Hunan Electric Power Test and Research Institute
0