您当前的位置:
首页 >
文章列表页 >
Detection and treatment on major questions during technical supervision and inspection of construction in power plants
更新时间:2025-11-18
    • Detection and treatment on major questions during technical supervision and inspection of construction in power plants

    • Vol. 31, Issue 2, Pages: 19-21+40(2011)
    • CLC: TM621.3
    • Published:2011

    移动端阅览

  • JIAO Qing-feng, YANG Jian-feng, CHEN Hong-dong, et al. Detection and treatment on major questions during technical supervision and inspection of construction in power plants[J]. 2011, 31(2): 19-21+40. DOI:

  •  
  •  

0

Views

107

下载量

5

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Cold Test and Numerical Simulation of Aerodynamic Field of W-Flame Boiler

Related Author

DUAN Xue-nong 1
CHENG Yi-ping 1
FANG Qing-yan 2
RUAN Gang 2
YU Wen-biao 3
LI Xiao-yu 4

Related Institution

Hunan Electric Power Test & Research Institute
Huazhong University of Science and Technology
Hunan Zhuzhou Power Plant
Shenzhen Jujian Co,LTD,Shenzhen518054,Guandong Province
  湖北武汉430074  
0