您当前的位置:
首页 >
文章列表页 >
Cause analysis and treatment of the unqualified gypsum produced by the FGD system in power plants
更新时间:2025-11-18
    • Cause analysis and treatment of the unqualified gypsum produced by the FGD system in power plants

    • Vol. 31, Issue 2, Pages: 27-29(2011)
    • CLC: X701.3
    • Published:2011

    移动端阅览

  • TAO Li1, ZHOU Nian-guang1, ZHOU Yan-ming1, et al. Cause analysis and treatment of the unqualified gypsum produced by the FGD system in power plants[J]. 2011, 31(2): 27-29. DOI:

  •  
  •  

0

Views

48

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

The Reason Analysis On Bursting for Over-temperheature of Boiler’s Superheater In Jin Zhushan Power Plant
Analysis on TA abnormality of 220 kV cassette metal expander
Reason Analysis and Preventive Measures for Jamming of Revolving Air Pre-heater
Analysis and Treatment on Active Power Fluction of Hydro Generator
Cause and Treatment of Bearing Wear Accident of Horizontal Francis Turbine Generator Set

Related Author

Huang Wei
SUN Wei
FANG Yi-ping
CHEN Bo
YIN Xu
JIANG Sennian
LIU Zheng
YING liqun

Related Institution

湖南省电力试验研究所
Hunan Electric Power Corporation Maintenance Company
Datang Youxian Energy Development Co.,Ltd.
Hunan Xiangdian Test & Research Institute Co.,Ltd
Tuokou Hydropower Plant
0