您当前的位置:
首页 >
文章列表页 >
Key technologies and problem analysis on Jinnan substation automation system
更新时间:2025-11-18
    • Key technologies and problem analysis on Jinnan substation automation system

    • Vol. 31, Issue 5, Pages: 4-7(2011)
    • CLC: TM63;TM76
    • Published:2011

    移动端阅览

  • ZHAO Yong-sheng1, SANG Zhong-qing2, LIU Hai-feng1, et al. Key technologies and problem analysis on Jinnan substation automation system[J]. 2011, 31(5): 4-7. DOI:

  •  
  •  

0

Views

129

下载量

11

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

A new general monitor platform design
Design of transformer overload control device based on IEC61850
IEEE1588对时系统在金南智能变电站的实现
Simple low voltage bus protection based on GOOSE in smart substation
Research for Value Dissemination of Verification Equipments for Electrical Energy Meters

Related Author

LU Suo-wang
LIN Xue-jun3
LI Yi2
ZHANG Hong-fei1
KANG Quan1
赵永生
欧阳帆
林海鹰

Related Institution

Dazhen irrigation management burea u
Ningbo Electric Power Bureau
Yinzhou Power Supply Bureau
Ningbo Newcity Construction Design Co.Ltd
湖南省电力公司科学研究院
0