您当前的位置:
首页 >
文章列表页 >
Problem analysis and treatment in operation and maintenance for value side bushing of converter transformer
更新时间:2025-11-18
    • Problem analysis and treatment in operation and maintenance for value side bushing of converter transformer

    • Vol. 33, Issue 5, Pages: 44-46(2013)
    • CLC: TM721.1
    • Published:2013

    移动端阅览

  • HUANG Yue-kui. Problem analysis and treatment in operation and maintenance for value side bushing of converter transformer[J]. 2013, 33(5): 44-46. DOI:

  •  
  •  

0

Views

117

下载量

6

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

The Reason Analysis On Bursting for Over-temperheature of Boiler’s Superheater In Jin Zhushan Power Plant
Low exciting limit test for excitation system of generator and countermeasure
600 MW supercritical W flame boiler coordination and main steam temperature control optimization
Analysis of on-line detection of GIS bushing discharge fault
Many State Comprehensive Diagnosis and Treatment of Bushing Tap Insulation Resistance Abnormality of 220kV Main Transformer

Related Author

Huang Wei
LU Cui-er1
LIU Yu2
FENG Hu-ben1
LIU Bo
WU Shuifeng
DUAN Xiaoli
XU Bo

Related Institution

湖南省电力试验研究所
Datang Huayin Jinzhushan Power Plant,Lengshuijiang
Hunan Electric Power Test & Research Institute
Datang Huayin Jinzhushan Power Branch Company
State Grid Hunan Electric power Corporation Research Institute
0