您当前的位置:
首页 >
文章列表页 >
Analysis and optimization of incipient faulty prediction unit of large-sized oil-filled equipments in converter station
更新时间:2025-11-18
    • Analysis and optimization of incipient faulty prediction unit of large-sized oil-filled equipments in converter station

    • Vol. 33, Issue 5, Pages: 47-49(2013)
    • CLC: TM721.1
    • Published:2013

    移动端阅览

  • MAO Zhi-ping, CHEN Li-geng, WU Jian-li. Analysis and optimization of incipient faulty prediction unit of large-sized oil-filled equipments in converter station[J]. 2013, 33(5): 47-49. DOI:

  •  
  •  

0

Views

41

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Simulation Study of Ferroresonance due to Line Trip
Study of the Electric Power Prediction of Generation Unit in Transient Stability Analysis
Operation analysis of imported L-type flame fired boiler
Analysis of cracks in weld seams of boiler steel structure
Analysis and optimization of quality of inner cooling water in 362.5MW generators

Related Author

TAN Shun-tao
SHI Qi-xin
LIU Tang-wei
WU Zheng-qiu
KUANG Wen-kai
LIU Jian-duan
PAN Pin
LIU Chun

Related Institution

  武汉大学电气工程学院 湖北武汉430072  
Wuhan University
  湖南大学电气与信息工程学院 湖南长沙410082  
Department of Electrical Engineering, Hunan University
  华能日照电厂 山东日照276800  
0