Design optimization of connecting pipe of condenser rear water chambers for large scale steam turbines
更新时间:2025-11-18
    • Design optimization of connecting pipe of condenser rear water chambers for large scale steam turbines

    • Vol. 34, Issue 5, Pages: 15-19(2014)
    • CLC: TK264.11
    • Published:2014

    移动端阅览

  • HU Chang-bin, LI Yan, WANG Xiao-yan. Design optimization of connecting pipe of condenser rear water chambers for large scale steam turbines[J]. 2014, 34(5): 15-19. DOI:

  •  
  •  

0

Views

32

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Phone Channel Automatic Supervising System Applied in Hunan Electric Power Dispatch and Communication System
Analysis and optimization of quality of inner cooling water in 362.5MW generators
Design and implement of Automatic Voltage Control(AVC) on Distributed Control System(DCS) in thermal power plant
Research on test of large steam turbine units optimal operation and economy analysis
Optimization and realization of protection logic of boiler tripping without turbine tripping for 600MW subcritical power unit

Related Author

YOU Hong
ZHONG Lian
JIA Xiuying
ZHENG Wei-de
TUO Wen-qun
ZHANG Xiao-dong2
PAN Cun-kun1
NING Shun-ti1

Related Institution

Hunan Elect ric Power Dispatch and Communication Center
  华能湖南岳阳发电有限责任公司 湖南岳阳414002  
Huaneng Yueyang Power Generation co.,Ltd
  湖南长沙410007  
Hunan Electric Power Dispatch & Communication Center
0