您当前的位置:
首页 >
文章列表页 >
Frame design of aerial work platform in substation based on genetic algorithm
更新时间:2025-11-18
    • Frame design of aerial work platform in substation based on genetic algorithm

    • Vol. 34, Issue 6, Pages: 13-16(2014)
    • CLC: TM63;TP18
    • Published:2014

    移动端阅览

  • HE Quan, WANG Bo-zhong, TAN Qing-ke. Frame design of aerial work platform in substation based on genetic algorithm[J]. 2014, 34(6): 13-16. DOI:

  •  
  •  

0

Views

25

下载量

4

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Optimization of regional spinning reserve capacity based on improved genetic algorithm
Optimization of Wind and Light Power Generation Prediction Model Based on RNA-CS Hybrid Algorithm
Short Term Power Forecasting Method of Improved BP Neural Network Based on Characteristic Analysis
Short-Term Load Forecasting Method Based on QPSO-ELM Combined with GA Theory

Related Author

LI Hui1
LI Ning1
LIANG Wen-ju2
GUAN Da
LING Yun
ZHANG Wujun
CHENG Yuanlin
ZHOU Jie

Related Institution

Hunan Electric Power Corporation Dispatches & Communication Bureau
College of Electrical and Information Engineering, Hunan University
Hunan University of Technology
China Energy Engineering Group Hunan Electric Power Design Institute Co.,Ltd.
Hunan Province Collaborative Innovation Center of Clean Energy and Smart Grid
0