您当前的位置:
首页 >
文章列表页 >
Reliability-based maintenance scheduling of transmission power network
更新时间:2025-11-18
    • Reliability-based maintenance scheduling of transmission power network

    • Vol. 35, Issue 5, Pages: 7-11(2015)
    • CLC: TM732
    • Published:2015

    移动端阅览

  • PENG Shiming, DENG Ji, LI Xin, et al. Reliability-based maintenance scheduling of transmission power network[J]. 2015, 35(5): 7-11. DOI:

  •  
  •  

0

Views

50

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Valve Switching Test of Imported 300MW Generation Unit and Its Economy Analysis under Single- and Sequence-Valve Operation
A View on Reliability Maintenance of Electric Equipments
Analysis of the Changsha Electric Power Network Expansion
Sliding pressure operation after modification of steam passagepart of No.3 unit in Jinzhushan power plant
Economy performance analysis of sliding pressure operation of 300MW steam turbine

Related Author

Li ChangAn 2
He JunMin 1
Li Ming 1
Qiu Shiyi
Ouyang Cong
SUN Yi-ping
HUANG Pi-wei1
QIU Ying-jun1

Related Institution

  湖南益阳413000  
Hunan Yiyang Power Generation Co.Ltd.
Hunan Electric Power Test & Research Institute
  湖南常德电业局 湖南常德415000  
Hunan Changde Electric Power Bureau
0